Project Hoa Hoi, Vung Tau
1. Location: Hoa Hoi, Xuyen Moc, Ba Ria – Vung Tau. Location: https://goo.gl/maps/TmMTjCsxBynZaUGeA 2. Area: 25,055m2 3. Purpose of land use: Land for growing perennials, annuals, and rice 4. Land use period: 2048 5. Origin of land use: The State allocates land without collecting land use levy. 6. Construction planning criteria: 7. Current status: – […]
1. Location: Hoa Hoi, Xuyen Moc, Ba Ria – Vung Tau.
Location: https://goo.gl/maps/TmMTjCsxBynZaUGeA
2. Area: 25,055m2
3. Purpose of land use: Land for growing perennials, annuals, and rice
4. Land use period: 2048
5. Origin of land use: The State allocates land without collecting land use levy.
6. Construction planning criteria:
7. Current status:
– Vacant land, 263m asphalt road frontage
– 37 km from Ba Ria – Vung Tau People’s Committee
– 100km from Ho Chi Minh City
8. Legal: Certification of land use rights
9. Form of transfer: Notarized transfer of name
10. Transfer price (VND): 30 Billion (1.2 million/m2)
11. Attach documents:
– Locate
– Location map of the land
– Certificate of land use right