Project Ho Dap 3, Lam Dong
1. Location: Dam Lake 3- Loc An Commune, Bao Lam, Lam Dong. Location: https://goo.gl/maps/FCRMEVJPz3os8dpB7 2. Area: 14,109m2 3. Land use purpose: Land for perennial crops 4. Land use term: 2067 5. Origin of land use: The State allocates land without collecting land use levy 6. Construction planning criteria: – Number of land plots: 14 each […]
1. Location: Dam Lake 3- Loc An Commune, Bao Lam, Lam Dong.
Location: https://goo.gl/maps/FCRMEVJPz3os8dpB7
2. Area: 14,109m2
3. Land use purpose: Land for perennial crops
4. Land use term: 2067
5. Origin of land use: The State allocates land without collecting land use levy
6. Construction planning criteria:
– Number of land plots: 14 each of 1000m2
7. Current status:
– Vacant land.
– 216 km from HCMC
– 20km from Bao Loc
8. Legal: Certification of land use rights
9. Form of transfer:
– Notarization of name transfer
– Sell the status quo, support to complete the infrastructure as soon as the rain stops and change residential areas, no later than the approved plan is Q1/2023
10. Transfer price (VND): 42.3 Billion (3 million/m2)
11. Attach documents:
– Locate
– Location map of the land
– Certificate of land use right