Project Kim Long
Project Kim Long

1. Location: Kim Long, Chau Duc, Ba Ria – Vung Tau
Location: https://goo.gl/maps/sLpNsmSKpfcveXda9
2. Area: 2978 m2.
3. Land use purpose: Land for perennial crops
4. Land use term: 2043
5. Origin of land use: The State allocates land without collecting land use levy.
6. Construction planning criteria:
7. Current status:
– Vacant land, 140m lake frontage.
– 33 km from BRVT People’s Committee
– 70km from Ho Chi Minh City
8. Legal: Certification of land use rights
9. Form of transfer: Notarized transfer of name
10. Transfer price (VND): 15 Billion (5 million/m2)
11. Attach documents:
– Locate
– Location map of the land
– Certificate of land use right