A. Location – Current Status
Location: 82 Ha Huy Giap, Thanh Loc Ward, District 12, HCMC
Land area: 6857.1 m²
Construction area: 2718 m²
Contiguous:
-
- Northeast: Adjacent to the proposed road with a width of 20m to Ha Huy Giap street, Nga Tu Ga overpass.
- West: Adjacent to the canal (12m backup road).
- South & North: Adjacent to existing residential areas.
Strength
-
- The land bank is in a good location, located in an existing residential area.
- Legal land is compact, not falling into too complicated legal cases.
- Convenient transportation connection.
Opportunity
-
- Expecting to break through the potential of urban economic development in the suburbs.
- The strong rebound of macroeconomic indicators, purchasing power….as well as the post-Covid19 real estate market.
- Supply of apartments in the city. HCM is not enough demand.